One More Sleep

There is only one more sleep until our first arrivals!!! 

This week has been partly about setting up the basics in the building so our pioneering early arrivals will be comfortable from day one and partly about preparation for all the rest of our new residents. 

Our Residential Assistant team arrives in just over a week to commence their training then the bulk of our 222 Willis Community will arrive sometime between the 15th and 23rd of February (depending on when their course of study commences). 

Over the next week we are also farewelling one of the founders and creators of 222 Willis, the Director of Special Projects at WelTec, Michael Hesp. 

Michael has been a key contributor to the development and formation of 222 Willis.  His vision helped to bring this unique, multi institutional facility to Wellington City and students will benefit from his work for years to come, thanks Michael!

We have been working on on the WiFi system at 222 Willis - we are working really hard to make sure the residents have great coverage and a great experience!  This is a picture of some of the preliminary testing we have been doing.

We have been working on on the WiFi system at 222 Willis - we are working really hard to make sure the residents have great coverage and a great experience!  This is a picture of some of the preliminary testing we have been doing.

A video of the team from Arrow Construction moving the mailboxes at 222 from the 1st floor to the ground floor near the lifts!

We have been configuring and testing our swipe card system.  All the exterior doors into 222 Willis and the apartment doors are on a swipecard system.  We will be starting to load all the room cards up next week.

We have been configuring and testing our swipe card system.  All the exterior doors into 222 Willis and the apartment doors are on a swipecard system.  We will be starting to load all the room cards up next week.